Product Overview
Cold Aisle Containment (CAC) approach encloses aisle space and makes airflow management efficient in server cooling, contributing to lower PUE and greener environment! The CAC solution gets cold air well directed from highly perforated doors, along through racks of servers, thereon comes out exhaust hot air returning to AC sets without mixing or obstructing. Customizable solutions are available based on site conditions and customer needs to help achieve lower PUE, greener operation, and higher efficiency.
◈
Cold Aisle: Ingenuous structures allow for hot/cold air containment and circulation. A single rack could serve max. 10KW in IT payloads.
◈
Power Distribution: Supports power distribution management system with smart control and monitoring display.
◈
System Design: Well-prepared components enable easy and flexible on-site implementation.
◈
Wiring: Cable sorting tools make possible neat and legible deployment.
◈
Monitoring: Smart sensing provides for insightful management and operation with various system compositions.
Industrial Profile
Since inception in 2008, the manufacturer has been transforming into a competitive player in the field of data center infrastructure management (DCIM), featuring a diversified portfolio which covers server cabinets, racks, intelligent supervision systems, power distribution, airflow containment, and precision air conditioners. With a streamlined production premise and a team of dedicated engineers, we ensure responsive actions to meet customer expectations.
In an era turning into a global race of AI competition, the production team assumes the trending challenge by empowering customers with state-of-the-art designs and solutions that deliver extraordinary performance while adding efficiency and lowering PUE costs.
Factory Presentation
Frequently Asked Questions
● Why choose our DCIM solutions?
We offer almost 20 years of experience in producing DCIM products, supported by a consolidated professional quality assurance team and over 20 R&D engineers operating in a 10,000+ square meter factory.
● What is the standard lead time for production?
The standard lead time for production is typically between 25-30 days depending on the order volume.
● Which trade terms do you support?
We provide flexible options including EXW, FOB, CFR, CIF, DDP, and DDU.
● How can I handle international trading as a new buyer?
We recommend using our door-to-door delivery service, which simplifies the process for those unfamiliar with international logistics.
● What certifications do the products carry?
Our manufacturing processes are certified under ISO 9001:2008, OHSAS 18001, and ISO 14001:2004. Products are compliant with CE, ROHS, and CQC standards.
● What is the monthly production capacity?
Our facility currently maintains a production capacity of 2000 sets per month to ensure timely supply.